Old tiles replaced with large-format porcelain, concealed fittings and a frameless glass shower.
The job started with a site visit and a 3D design. Once the design and fixed price were approved, it was built and handed over on the contract schedule.
Old tiles replaced with large-format porcelain, concealed fittings and a frameless glass shower.
The job started with a site visit and a 3D design. Once the design and fixed price were approved, it was built and handed over on the contract schedule.